The Constructor Mobile App project aims to create a seamless learning experience across both web and mobile platforms. Our approach leverages a hybrid architecture with a 30% native / 70% web distribution to maximize development efficiency while ensuring optimal user experience on mobile devices.

Overall Progress 0%
How progress is calculated: Overall progress is based on a weighted average of task completion (50%), screen implementation status (40%), and team readiness (10%). This provides a comprehensive view of the project's health.
12
Weeks to MVP
70%
Web Components
30%
Native Components

Key Principles

  • Mobile-First Design: Optimize for smaller screens first, then enhance for larger displays
  • Consistent Navigation: Implement bottom navigation for mobile, standard navigation for web
  • Performance Optimization: Focus on load times, offline capabilities, and resource efficiency
  • Shared Components: Develop reusable components that work seamlessly across platforms
  • Progressive Enhancement: Start with core functionality and progressively add platform-specific features

Implementation Strategy

Our implementation strategy follows a phased approach to ensure steady progress and regular deliverables:

Phase 1: Foundation & Authentication
Weeks 1-2
Establish project structure, implement authentication, and create core navigation components.
Phase 2: Course Discovery & Content Viewing
Weeks 3-4
Develop course browsing capabilities, implement content viewers for various media types.
Phase 3: Assignments & Calendar
Weeks 5-6
Create assignment submission flows, implement calendar and scheduling functionality.
Phase 4: Notifications
Weeks 7-8
Implement notification system with push capabilities.
Phase 5: Video Conferencing & Chat
Weeks 9-10
Integrate video conferencing tools, implement chat functionality using RocketChat SDK.
Phase 6: Offline Access & Final Polishing
Weeks 11-12
Add offline capabilities, conduct thorough testing, and prepare for release.

Data Management

All project progress and status information is saved locally in your browser's storage. You can:

Implementation Progress

Progress calculation: Phase progress is based on task completion (60%) and screen implementation status (40%) for the relevant components in each phase.
Phase 1: Foundation & Authentication 0%
Phase 2: Course Discovery & Content 0%
Phase 3: Assignments & Calendar 0%
Phase 4: Notifications 0%
Phase 5: Video Conferencing & Chat 0%
Phase 6: Offline Access & Final Polish 0%

Resource Allocation

Resource allocation is calculated based on task complexity, priority, and estimated effort required for each feature area. It shows how your team's time is distributed across different components of the project.
Authentication & Navigation 25%
Course Content & Discovery 20%
Assignments & Calendar 15%
Video Conferencing & Communication 20%
Offline Access & Notifications 10%
Testing & Quality Assurance 10%
Task tracking: Check off tasks as they are completed. Task completion directly affects progress indicators across the dashboard. All changes are automatically saved in your browser.

Authentication & Navigation High Priority

Course Discovery High Priority

Content Viewing High Priority

Assignments High Priority

Calendar & Schedule Medium Priority

Video Conferencing High Priority

Chat Integration High Priority

Notifications High Priority

User Profile & Settings Low Priority

Offline Access Medium Priority

AI Learning Assistant Medium Priority

Screen implementation tracking: Update the implementation progress and status for each screen. These values directly affect the overall project progress indicators and phase completion percentages.

Authentication & Navigation

Login & Authentication
Progress: %
Bottom Navigation
Progress: %
User Onboarding
Progress: %

Course Discovery & Content

Course Catalog
Progress: %
Course Details
Progress: %
Content Viewer
Progress: %

Assignments & Calendar

Assignment List
Progress: %
Assignment Details & Submission
Progress: %
Calendar View
Progress: %

Notifications

Notification Center
Progress: %
Notification Settings
Progress: %

Video Conferencing & Chat

Video Call Interface
Progress: %
RocketChat Integration
Progress: %

Offline Access & Settings

Download Manager
Progress: %
Profile & Settings
Progress: %
AI Learning Assistant
Progress: %

Implementation Timeline

Project Kickoff
April 1, 2025
  • Finalize requirements and specifications
  • Set up development environments
  • Configure CI/CD pipeline
  • Create initial project structure
Authentication & Navigation (Phase 1)
April 15, 2025
  • Complete SSO integration
  • Implement core navigation components
  • Develop login and authentication flows
  • Create responsive header and footer components
Course Discovery & Content (Phase 2)
May 1, 2025
  • Complete course browsing functionality
  • Implement content viewers for various media types
  • Develop course details pages
  • Add progress tracking components
Assignments & Calendar (Phase 3)
May 15, 2025
  • Complete assignment submission flows
  • Implement calendar and scheduling functionality
  • Develop grading and feedback displays
  • Add reminder and notification capabilities
Notifications (Phase 4)
June 1, 2025
  • Complete discussion forums implementation
  • Develop notification center
  • Implement push notification system
  • Add notification preferences controls
Video Conferencing & Chat (Phase 5)
June 15, 2025
  • Complete video conferencing implementation
  • Integrate RocketChat functionality
  • Add screen sharing capabilities
  • Implement seamless navigation between app and chat
Offline Access & Polish (Phase 6)
July 1, 2025
  • Complete offline content access implementation
  • Implement synchronization mechanisms
  • Add final UI polish and refinements
  • Conduct comprehensive testing
Beta Release
July 15, 2025
  • Release beta version to select users
  • Gather feedback and telemetry data
  • Address critical issues and bugs
  • Finalize documentation
Official Launch
August 1, 2025
  • Release to production stores
  • Begin post-launch monitoring
  • Initiate marketing and adoption campaigns
  • Plan next feature development phase

Project Team

PM
Product Manager Part-time
Responsible for requirements prioritization and stakeholder management
FL
Frontend Lead
Managing webview components and responsive design
FD
Frontend Developer
Learning Swift/Kotlin while supporting implementation
KD
Android Developer(Kotlin) Not Available
Develop native part of app for Android
KD
Android Developer(Kotlin) Not Available
Develop native part of app for Android
SD
iOS Developer(Swift) Not Available
Develop native part of app for iOS
SD
iOS Developer(Swift) Not Available
Develop native part of app for iOS
MT
Mobile Tech Lead Not Available
Architecture and coordinate mobile development
QA
QA Engineer Not Available
Testing across multiple devices and platforms
MD
Mobile Designer Not Available
Design across multiple devices and platforms
BE
Backend Engineer Not Available
Mobile API Support, Notification center

Team Readiness & Capacity

Current team capacity is limited with only 2 full-time developers and 1 part-time resources. This affects our ability to deliver all features simultaneously.

Team Capacity Utilization 25%
Required Skills Coverage 20%

The lack of dedicated Mobile Designer, Backend Developer and QA Engineer poses risks to the project timeline and quality. We are working to address these gaps through:

  • Frontend Lead taking on additional design responsibilities
  • Using existing web backend APIs with minimal modifications
  • Implementing more automated testing to compensate for QA limitations

Key Risks & Mitigations

⚠️
Limited Development Resources
The small team size may impact our ability to deliver all features within the timeline.
Mitigation: Prioritize core features, leverage web components where possible, and use an incremental delivery approach.
⚠️
Webview Performance Limitations
Webview components might not deliver the performance needed for complex features like video playback or conferencing.
Mitigation: Identify performance-critical components early and implement them with native code.
⚠️
RocketChat Integration Complexity
The existing RocketChat implementation may be challenging to integrate smoothly into the mobile experience.
Mitigation: Evaluate WebView vs React Native SDK approaches early. Create a proof of concept for the preferred approach before committing.
⚠️
Inconsistent User Experience
Mixing native and web components might lead to inconsistent UI/UX across different parts of the app.
Mitigation: Create a unified design system for both web and native components, with consistent patterns.
⚠️
Integration Challenges
Integration with third-party services like video conferencing or authentication might be complex.
Mitigation: Start integrations early, create POCs, and have fallback options identified.
⚠️
Skill Gaps with Intern Developer
Having a part-time intern as the primary Kotlin developer may impact code quality and development speed.
Mitigation: Implement thorough code reviews, provide additional training, and consider focusing their work on well-defined, contained tasks.

Dependencies

⚠️
Backend API Readiness
Mobile implementation depends on backend APIs being ready and stable.
Approach: Work with backend team to prioritize mobile-critical endpoints, use mocks for development.
⚠️
Video Conferencing Service Integration
Implementation timeline depends on SDK availability and support for mobile web.
Approach: Start with POC to validate integration approach, have alternative solutions identified.
⚠️
RocketChat Implementation Strategy
Need to determine the optimal approach for integrating RocketChat functionality (WebView vs React Native SDK).
Approach: Research both options, create simple prototypes to evaluate performance and UX, and select the most promising approach early.

Project Requirements

Implementation Strategy: This plan follows a hybrid approach (70% webview, 30% native) to maximize efficiency while providing optimal user experience. Requirements are categorized into delivery phases: PoC (Proof of Concept, first release), MVP (Minimum Viable Product, second release), and Future Releases.
0
PoC Requirements
0
MVP Requirements
0
Future Release
Requirements Coverage 0%
# Feature Description User Scenario Implementation Approach Status
1 Single Sign-On PoC Enable users to log in with institutional credentials or social login options Students need to sign in quickly with their established credentials Hybrid
2 User Profile Management PoC Allow students to view and edit their profile information, including notification preferences Students need to update contact info and communication preferences WebView
3 Course Catalog PoC Browse available courses with filtering, sorting and search capabilities Students need to find relevant courses based on their program/interests WebView
4 Course Details & Enrollment PoC View course details including syllabus, instructor info, and enroll in courses Students need course information to make enrollment decisions WebView
5 Course Home/Dashboard PoC Display course overview, announcements, upcoming assignments, and module navigation Students need a central starting point for each course with key information and navigation WebView
6 Module Navigation PoC Hierarchical navigation through course modules, units, and content pages Students need to navigate course structure and access learning materials in sequence Hybrid
7 Video Content Player PoC Native video player with playback controls, speed adjustment, and offline support Students need to watch lectures and video content with optimal mobile experience Native
8 Text Content Viewer PoC Mobile-optimized reading view with accessibility options and progress tracking Students need to read course materials with comfortable reading experience Hybrid
9 Document Viewer MVP Support for PDF, DOCX, and other document formats with zoom and navigation controls Students need to view course documents and reading materials Hybrid
10 Progress Tracking PoC Track and display student progress through course modules and content Students need to see their progress and completion status in courses Hybrid
11 Assignment List PoC View list of assignments with status, due dates, and filtering capabilities Students need to track and manage their pending assignments Hybrid
12 Assignment Submission PoC Submit assignments with text entry, file upload, and mobile camera integration Students need to complete and submit work from their mobile devices Hybrid
13 Grade Viewing MVP View grades and feedback for assignments and assessments Students need to track their academic performance WebView
14 Quizzes & Tests MVP Take online quizzes and assessments with various question types and timed limits Students need to complete course assessments directly from mobile devices WebView
15 Peer Reviews Future Participate in peer review assignments, providing feedback on classmates' work Students need to evaluate peers' submissions as part of course activities WebView
16 Practice Exercises MVP Engage with interactive practice activities with immediate feedback Students need to practice concepts and receive immediate guidance WebView
17 Course Calendar PoC View course schedule, deadlines, and events in calendar format Students need to plan their study schedule around important dates Native
18 Calendar Integration MVP Sync course events with native device calendar and set reminders Students need to integrate course schedules with personal calendars Native
19 To-Do List MVP Task management with due dates, priorities, and completion tracking Students need to organize and track their course tasks Native
20 Discussion Forums MVP Browse, read, and participate in course discussion boards Students need to engage in course discussions with peers and instructors WebView
21 Messaging/Chat MVP Direct messaging with instructors and peers using RocketChat integration Students need to communicate privately with instructors and classmates Hybrid
22 Video Conferencing MVP Join and participate in video conferences and virtual classrooms Students need to attend live sessions and group meetings Native
23 Announcement Viewing PoC View course and institution-wide announcements Students need to stay informed about important updates and information WebView
24 Push Notifications PoC Receive real-time notifications for deadlines, grades, and announcements Students need timely alerts about course activities and updates Native
25 Notification Center PoC View and manage all notifications within the app Students need centralized access to all notifications and alerts Native
26 Flashcards & Study Aids Future Use interactive study tools like flashcards and practice quizzes Students need additional tools to help reinforce learning and prepare for assessments WebView
27 Group Collaboration Future Collaborate on group projects and assignments with shared workspaces Students need tools for team-based coursework and activities Hybrid
28 Offline Content Access MVP Download and view course content without internet connection Students need to study even when internet connectivity is limited Native
29 Download Manager MVP Manage downloaded content with storage usage information Students need to control which content is stored offline Native
30 AI Learning Assistant Future AI-powered assistance for answering questions and explaining concepts Students need on-demand help with course materials and concepts WebView
31 Progress Analytics Future Visualizations of course progress, grades, and learning patterns Students need insights about their academic performance WebView
32 Dark Mode & Accessibility Future Support for dark mode and enhanced accessibility features Students need comfortable viewing options and accessibility support Hybrid
33 Document Scanning Future Scan physical documents using device camera with OCR capabilities Students need to digitize handwritten notes or printed materials Native
34 Interactive/Multimedia Content Future Support for H5P, simulations, and other interactive learning content Students need to engage with interactive learning experiences Hybrid
35 Badges & Certifications Future View and share earned achievements, badges, and certificates Students need to track and showcase their accomplishments WebView

Add New Requirement

Made on
Tilda